If it is determined that a CPSR is required, then the ACO will have to perform a threat assessment every single a few yrs thereafter to find out irrespective of whether a abide by-up CPSR is required.(e) If the Contractor receives the Contracting Officer’s closing dedication of fabric weaknesses, the Contractor shall, inside of forty five days of